Net Zero Teesside is one of the UK’s most significant energy infrastructure developments, bringing together large-scale power generation and carbon capture technology as part of the transition towards lower-carbon energy.
At a facility of this scale, fire protection is an essential element of operational safety. The ability to start these pumps reliably, when required, is fundamental. In an emergency, there is no opportunity for hesitation or failure. The starting system must be engineered to deliver dependable performance when it matters most.
Powerstart Project Case Studies
Discover how Powerstart systems perform in the field — from offshore drilling platforms to underground mining sites. Our case studies highlight real applications, engineering solutions, and measurable results across marine, oil & gas, mining, and power generation industries.
Case Studies from the World’s Toughest Environments
Onshore fire pump, Middle East
Powerstart supplied two hydraulic starting systems for emergency fire pumps operating on a Middle Eastern oil field. Designed for CAT C18 engines, each system delivers a minimum of 45 seconds of cranking from three 50 litre accumulators. The units were mounted inside IP-rated cabinets with custom control panels, engineered to withstand local seismic conditions and ensure reliable starts in harsh outdoor environments.
Oil & Gas
Learn more
Mining
Learn more
Marine
Learn more
Power gen
Learn more
Fire Pumps
Learn more
Oil & Gas
Learn more
Mining
Learn more
Marine
Learn more
Power generation
Learn more
Fire Pumps
Learn more


